diff --git a/docs/roadmap.md b/docs/roadmap.md index eb3e356..4d80271 100644 --- a/docs/roadmap.md +++ b/docs/roadmap.md @@ -79,33 +79,13 @@ and produced nothing. The management card fabricates a healthy pack. **The `UpsSelfTestFailed` silence must be deleted the moment the pack is fitted, not left to expire** — the issue carries the command and the reasoning. -- [ ] **Rack the shelf switch.** A 1U vented shelf (~$25–45) in **U4**, the one - free slot, carrying the unmanaged TP-Link that `prometheus` and `oracle` - hang off. **Buy it with the UPS pack above, not after** — the pack alone - leaves the monitoring path half-protected. Both shelf machines are laptops - with their own batteries, so on a mains cut they stay *running* and go - *deaf*: the switch between them and the network has no battery at all, and - a monitoring host that survives the event it exists to observe but cannot - report it is a strange way to lose an evidence trail. The shelf has room - beside the switch for the ProDesk in the item above — rack its cold-spare - role but leave it **powered off**, since a spare that is plugged in and on - the network is exposed to whatever took the primary. - - Measured at the rack 2026-08-21, so the spec is settled: **4-post frame, - square mounting holes, depth is not a constraint.** That means a full 1U - shelf with rear support — not a cantilever — and **cage nuts plus screws**, - which most shelves include but not all; check the listing rather than - discovering it on the day. U4 is empty only because nothing had been chosen - for it, so there is no service clearance to preserve. - - The one thing that could have removed the purchase has been checked and - does not: `morpheus` sits at U5 in a **purpose-built mount that holds one - ProDesk Mini** — a single-device bracket, not a shelf with spare room. So - the switch needs its own U, and the shelf is the way to give it one. The - 1U shelf also has room beside the switch for a second small box later, - which the U5 bracket by design does not. - - This one has no issue yet — everything else in this file does. +- **[#110](https://github.com/Gerrrt/HomeLab/issues/110) Rack the shelf switch.** + A 1U vented shelf in **U4**, carrying the unmanaged switch `prometheus` and + `oracle` hang off. **Buy it with the UPS pack above, not after** — both shelf + machines are laptops, so on a mains cut they stay running and go deaf while the + switch between them and the network has no battery at all. Spec settled at the + rack on 2026-08-21; the spare ProDesk from + [#92](https://github.com/Gerrrt/HomeLab/issues/92) racks here too, powered off. - **[#94](https://github.com/Gerrrt/HomeLab/issues/94) Decide what `oracle` is for.** A dual-core A6-9200 with 4 GB and a 5400 rpm disk — too little for anything demanding, and a candidate for the jobs that need a machine that is