Skip to content

ci(fdroid): build a named commit on demand and upload the signed flav… #62

ci(fdroid): build a named commit on demand and upload the signed flav…

ci(fdroid): build a named commit on demand and upload the signed flav… #62

Triggered via push September 3, 2026 20:59
Status Cancelled
Total duration 1m 33s
Artifacts –

tests.yaml

on: push
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
src-tauri
Canceling since a higher priority waiting request for tests-refs/heads/master exists
src-tauri
The operation was canceled.
vector-core
Canceling since a higher priority waiting request for tests-refs/heads/master exists
vector-core
The operation was canceled.
Tests
Canceling since a higher priority waiting request for tests-refs/heads/master exists
src-tauri
Node.js 20 is deprecated. The following actions target Node.js 20 but are being forced to run on Node.js 24: actions/checkout@v4, actions/setup-node@v4. For more information see: https://github.blog/changelog/2025-09-19-deprecation-of-node-20-on-github-actions-runners/
vector-core
Node.js 20 is deprecated. The following actions target Node.js 20 but are being forced to run on Node.js 24: actions/checkout@v4. For more information see: https://github.blog/changelog/2025-09-19-deprecation-of-node-20-on-github-actions-runners/