Generated: 2026-08-01 Purpose: Complete inventory of every task, plan, roadmap, and work item discovered across the pixelated monorepo and all submodules. Method: Exhaustive file search + content scan. No filtering, no dedup, no status assessment.
- PIX-4125: Enterprise gap — SOC2/HIPAA — DONE
- PIX-4126: Enterprise gap — DR — DONE
- PIX-4127: Enterprise gap — pen testing — DONE
- PIX-4128: Enterprise gap — chaos eng — DONE
- PIX-4129: Enterprise gap — SLA/SLO — DONE
- PIX-4130: Enterprise gap — vendor risk — DONE
- PIX-4133 (DR-2): Database Backup & Restore Testing — DONE
- PIX-4134 (DR-3): Infrastructure Disaster Recovery Procedure — DONE
- PIX-4146 (SLA-3): Draft Customer SLA Contract Terms — DONE
- PIX-4148 (CE-1): Install Chaos Engineering Tooling — DONE
- PIX-4149 (CE-2): Define Resilience Testing Scenarios — DONE
- PIX-4150 (CE-3): Run Weekly Chaos Experiments — DONE
- PIX-4157 (SOC2-4): Engage External Auditor — DONE
- PIX-3746 (EPIC): CI Federation Execution & Go-Live — DONE
- Promotion gate test workflow — DONE (commit d03f0ac11)
- CI operating model RFC — APPROVED
- PIX-4192 (P0): Stage-Aware Deduplication Algorithm — DONE
- PIX-4193 (P0): Stage-Based Dataset Directory Organizer — DONE
- PIX-4194 (P0): Stage 4 Voice Persona Processing Pipeline — DONE
- PIX-4195 (P0): Correct Stage 1 Training Notebook Path — DONE
- PIX-4196 (P1): Stabilize TypeScript Test Baseline (42 Vitest Failures) — DONE
- PIX-4197 (P1): Fix NeMo Data Designer NGC Auth — CANCELED
- PIX-4198 (P1): Field-Level FHE Database Encryption Hooks — DONE
- PIX-4199 (P2): Ingest Stage 5 Safety/DPO Datasets — DONE
- PIX-4200 (P3): Causal DAG Execution Engine & Intervention API — DONE
- P0-1 Edge-Case Safety Filter Bypass — DONE
- R1 Cryptographic Receipts — DONE
- L4 JIT Trigger Engine — DONE
- INT-1 through INT-5 integration tickets — ALL DONE
- Phase 1-7 all DONE
- PIX-3906 through PIX-3912 — ALL DONE
- All issues DONE
- PIX-4164: Remove @babel/core override once ecosystem patches — TODO (blocked on external)
- PIX-4165: Remove react-router monitoring workaround — TODO (blocked on external)
- PIX-4166: Remove accepted localstack risk once patched — TODO (blocked on external)
- 26 issues lack project assignment (per linear_audit.md)
- Emit Events from Bias Detection — HIGH priority
- File: src/lib/ai/bias-detection/python-service/bias_detection/services/analysis_orchestrator.py
- After analyze_session() completes, publish EventBus events
- Wire Receipt Root Hash to Bias Detection — HIGH priority
- Same file, accept receipt_root_hash in session_data
- JIT Scenario Injection into Nightmare Fuel — HIGH priority
- New file: ai/triggers/jit_scenario_injector.py
- Per-Clinician Flag Grouping — MEDIUM priority
- File: foresight/foresight/triggers.py
- Receipt-Ledger Persistence — MEDIUM priority
- File: ai/receipts/receipt.py + new ai/receipts/persistence.py
- FHE Ciphertext Hash Integration — MEDIUM priority
- NOTE: This was completed (PIX-4190) — file is STALE on this item
NOTE: The Linear tickets section at bottom of IMPLEMENTATION_PLAN.md shows ALL items checked [x] including INT-1 through INT-5. The "Remaining Work" section appears to be STALE — not updated after completion.
- Phase 1: Persona Data Pipeline — DONE
- Phase 2: Mixed-task SFT — DONE
- Phase 3: DPO Preference Pairs — DONE
- Phase 4: Select-then-Generate Inference — DONE
- Phase 5: Evaluation (C.score) — DONE
- Phase 6: End-to-end smoke — OPEN
- 6.1: Run SFT + DPO on small subset, confirm checkpoint shape, inference latency, C.score movement
- Phase 1: Infrastructure (Week 1) — PIX-160, PIX-3762
- Phase 2: Critical Path (Weeks 2-3) — 10 P0/P1 modules
- Phase 3: Supporting Modules (Weeks 4-5) — 4 P2 modules
- Phase 4: Scale Modules (Weeks 6-8) — 4 P3 modules
- Phase 5: Baseline Lock (Week 9)
- Phase 1: Database Connection Pool Integration — STATUS UNKNOWN
- Phase 2: Defense Metrics API Endpoint — STATUS UNKNOWN
- Phase 3: React Components for Progress Visualizations — STATUS UNKNOWN
- Phase 4: Enhanced Dashboard & Progress Page Integration — STATUS UNKNOWN
- Create surgical_fix_2025_09.py — STATUS UNKNOWN
- Update monthly_pipeline.py for Postgres+Redis deterministic batching — STATUS UNKNOWN
- Modify monthly_llm_prompt templates — STATUS UNKNOWN
- Task 1: Consolidate env vars — DONE
- Task 2: Unified docker-compose.backend.yml — DONE
- Task 3: FastAPI Dockerfile — DONE
- Task 4: Node microservice Dockerfiles — DONE
- Task 5: DB migration wiring — DONE
- Task 6: Grafana/Prometheus provisioning — DONE
- Task 7: Integration test — DONE
- Task 8: Makefile + pnpm scripts — DONE
- Task 9: Health-check script — DONE
- Task 10: Final verification — DONE
- Final verification F1-F4 — ALL DONE
- Phase 1: Market Validation (Months 1-12) — US/Canada
- Phase 2: Market Expansion (Months 13-24) — UK/Australia/NZ
- Phase 3: Market Leadership (Months 25-36) — Europe/Asia-Pacific
- Phase 4: Global Leadership (Months 37-48) — Global
- 6-month institutional validation program
- Month 1: Foundation & Setup
- Month 2: Core Training Integration
- Month 3: Advanced Scenarios & Edge Cases
- Month 4: Specialization & Customization
- Month 5: Competency Assessment & Certification
- Month 6: Scale Planning & Partnership Development
- 01-executive-summary.md
- 02-market-analysis.md
- 03-sales-tactics.md
- 04-partnership-strategy.md
- 05-marketing-division-structure.md
- 09-expansion-pivot-opportunities.md
- case-study-library.md
- crm-marketing-automation.md
- cultural-adaptation-framework.md
- customer-success-management.md
- demo-strategy.md
- international-market-research.md
- outcome-measurement-system.md
- pilot-program-structure.md
- pitch-deck-outline.md
- pricing-strategy.md
- professional-associations.md
- roi-calculator.md
- sales-team-structure.md
- specialized-training-modules.md
- target-institutions.md
- thought-leadership-strategy.md
- university-research-partnerships.md
- webinar-program.md
- 17 gaps identified across 4 phases
- Phase 1: Governance & Risk (Weeks 1-4) — 6 P0 items
- Phase 2: Breach & BAA (Weeks 5-8) — 5 items
- Phase 3: Procedures & Training (Weeks 9-12) — 5 items
- Phase 4: Documentation & Audit (Weeks 13-16) — 5 items
- 17 gaps identified across 4 phases
- Phase 1: Foundation (Weeks 1-4) — 6 P0 items
- Phase 2: Data & Privacy (Weeks 5-8) — 5 items
- Phase 3: Vendor & Monitoring (Weeks 9-12) — 5 items
- Phase 4: Audit Preparation (Weeks 13-16) — 4 items
- hipaa-officer-designations.md
- hipaa-risk-analysis.md
- hipaa-training-program.md
- baa-template.md
- sla-contract-terms.md
- vendor-inventory.md
- vendor-security-reviews.md
- chaos-production-approval-process.md
- policies/access-control-procedure.md
- policies/change-management-policy.md
- policies/deficiency-tracking-procedure.md
- policies/incident-response-plan.md
- policies/information-security-policy.md
- runbooks/backup-restore-testing.md
- runbooks/dr-rto-rpo-targets.md
- runbooks/infra-disaster-recovery.md
- runbooks/resilience-testing.md
- runbooks/sla-breach-response.md
- runbooks/slo-definitions.md
- 537 issues audited
- 39 remediations applied
- All acceptance criteria met
- risk-register.md
- threat-model-scope.md
- pentest-cadence.md
- vendor-register.md
- vendor-risk-assessment-framework.md
- vendor-engagement.md
- vendor-rfp.md
- vendor-sow.md
- api-specification-vendor-share.md
- s3-scan-results.md
- project_descriptions_audit.md
- 5 items, all RESOLVED or TRIAGED
- 2 items deferred to infrastructure provisioning (not code tasks)
reviewcanonical state missing from STATUS_ALIASES — HIGH- No priority sync between providers — HIGH
- No label sync — MEDIUM
- No per-project mappings — HIGH
- 162 unmapped Linear-only issues — MEDIUM
- No Jira→Linear reverse map — LOW
- Circular import risk — LOW
- No automated sync daemon — HIGH
- Implement test framework setup
- Create initial test scenarios
- Set up CI/CD integration
- Create test data management system
- Implement performance testing infrastructure
- Set up security testing tools
- Configure HIPAA compliance validation
- gem-planner.md
- task-planner.md (edge-ai-tasks)
- polyglot-test-planner.md
- task-planner.md (project-planning)
- implementation-plan.md
- plan.md
- planner.md
- terraform-azure-planning.md
- Future Considerations section lists 3 items:
- Upgrade ci.yml from SOFT to HARD gates — "Next sprint" — DevOps
- Establish weekly CI operations review — "Next sprint" — DevOps/AI Team
- Automate readiness aggregator as pre-deploy check — "Q3 2026" — DevOps
- PRD_PIX-499.md — PRD document, may contain implementation steps
- TEST_EXECUTION_REPORT.md — Test report, not a plan
- production_deployment_guide.md — Reference doc
- troubleshooting_guide.md — Reference doc
- user_onboarding_guide.md — Reference doc
- supervisor-agent/README.md
- intake-agent/README.md
- pipeline-agent instructions
- advisor-agent instructions
- qa-agent instructions
- session-agent instructions
- scripts/training/KAGGLE_SETUP.md — Setup guide
- scripts/delta-analysis-framework.md — Framework doc
Total unique task/plan sources discovered: 17 categories Total individual work items identified: ~200+ Sources with explicit remaining/open work: Sources 2, 3, 4, 5, 6, 8, 9, 12, 13, 16