Skip to content

Design addition: credit and contact line  #106

Description

@WABA-Comms

PROPS!

Trusting your design eye and design decisions for a sleek, simple, consistent look. Please add, "This map was built by incredible volunteers from DCFemTech (link) and Code For DC (link). The bike data (link to data matrix) was pulled from the respective DOTs on September 1st, 2016. Send bike infrastructure questions to advocacy@waba.org. ”

Color: Your call
Size: You do you
Position: the best place

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Type

No type

Projects

No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions