Skip to content
IIT-EnergySystemModelsPublic

About

DEPLOhy: "Determining long-term capacity expansion planning and operation of electrolyser plants for hydrogen deployment" is a two-stage stochastic multi-period model featuring detailed electrolyser efficiency and degradation modelling. It jointly optimises sizing and operational decisions.

Resources

Stars

1 star

Watchers

0 watching

Forks

Latest commit

 

History

28 Commits

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 
 
 

Repository files navigation

About

DEPLOhy: "Determining long-term capacity expansion planning and operation of electrolyser plants for hydrogen deployment" is a two-stage stochastic multi-period model featuring detailed electrolyser efficiency and degradation modelling. It jointly optimises sizing and operational decisions.

Resources

Stars

1 star

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages