A mission that stops at the first failed action throws away everything it learned getting there. survey_mission now asks for a policy again, up to three times (--attempts), and the planner reads the epistemic state as the mission left it: a scan that already happened is not planned for twice.

The executor is not the place for this. It executes the plan it was given and reports which action failed; asking for another plan belongs to whoever owns the mission, which is where it went.

The domain change that goes with it

goto_site stopped consuming at_depot. An action whose at-start effect asserts it has left the depot cannot be dispatched a second time, and a mission that replans after a failure dispatches it a second time. The requirement stays; only its consumption goes.

Worth recording why the requirement stays rather than the whole condition: an empty :condition (and) made the executor's feedback watchdog fire and re-request an action that was already running, so a drive was dispatched twice. With the requirement in place the two-site mission runs each action once, in 16.3 s parallel against 23.8 s serial.

Measured on the fleet

The link-drop experiment cuts the fleet adapter mid-drive, with the bridge's wait set to 30 s:

planning (attempt 1 of 3)
goto_site: 0 of 1 RMF task(s) done after 30s, last underway
(goto_site scout):0 failed: RMF task timed out
the policy failed; replanning from the state the mission reached
planning (attempt 2 of 3)
...
mission failed after 3 attempt(s)

The loop does what it says. What it does not buy is recovery, and the reason is on the fleet's side: a restarted fleet_adapter re-initialises its robots at their chargers, so the tasks it accepts afterwards never complete. Measuring recovery needs the link interrupted without killing the adapter.

A mission that stops at the first failed action throws away everything it
learned getting there. This one asks for a policy again, up to three
times, and the planner reads the epistemic state as the mission left it:
a scan that already happened is not planned for twice.

The drive stops consuming at_depot for the same reason. An action that
asserts it has left the depot cannot be dispatched a second time, and a
mission that replans after a failure dispatches it a second time.

Measured over the RMF fleet with the link cut mid-drive: the action fails
with the reason the bridge gave, the mission says which action died, and
the next attempt plans from what was known. Recovery needs more than
this --- a restarted fleet adapter believes its robots are at their
chargers --- and that is recorded with the experiment.
@HanielUlises
HanielUlises merged commit 24c4fca into rolling Sep 23, 2026
4 checks passed
@HanielUlises
HanielUlises deleted the executor/replan-after-failure branch September 23, 2026 01:01
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant