Skip to content

Release 0.3.0 - #43

Merged
HanielUlises merged 1 commit into
rollingfrom
release/0.3.0
Sep 28, 2026
Merged

HanielUlises merged 1 commit into
rollingfrom
release/0.3.0

Conversation

@HanielUlises

Copy link
Copy Markdown
Collaborator

Moves the eight epistemic packages from 0.2.0 to 0.3.0, writes their changelogs, and sets the docs version.

What 0.3.0 adds since v0.2.0:

  • del-planner is pinned at 314bc29, and both solvers refuse plans that rest on a belief in a contradiction (consistent_beliefs, on by default).
  • The tracked model is repaired only when the planner's is.
  • Parallel dispatch, and actions move above a branch point (the two-site survey drops from 22.5 s to 15.3 s).
  • Replanning after a failed action.
  • A Docker image that runs the two-site survey.

Once this merges, v0.3.0 gets tagged on the merge commit.

@HanielUlises
HanielUlises merged commit 6e8d595 into rolling Sep 28, 2026
4 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant