Goal
Prepare the smallest credible uni-7 v31 upgrade-instructions change, following the merged v30 precedent in CosmosContracts#388.
Expected diff
- add
uni-7/02_V31_UPGRADE.md
- update
uni-7/README.md to point at the current upgrade
Verified inputs
Release gates before upstream submission
Non-goals
- no governance proposal payload
- no speculative release SHA, checksum, height, or date
- no upstream PR until the release inputs and schedule are fixed
Goal
Prepare the smallest credible uni-7 v31 upgrade-instructions change, following the merged v30 precedent in CosmosContracts#388.
Expected diff
uni-7/02_V31_UPGRADE.mduni-7/README.mdto point at the current upgradeVerified inputs
juno-ai-dev/juno:v31v31v30.0.0Release gates before upstream submission
v31.0.0release tag and commit existjunod version --longoutput and wasmvm linkage are verifiedNon-goals