Skip to content

Wire review voting, risk tier gate and SDD stages into the engine - #84

Merged
Param-Harrison merged 3 commits into
mainfrom
feat/wire-engine
Oct 30, 2026
Merged

Param-Harrison merged 3 commits into
mainfrom
feat/wire-engine

Conversation

@Param-Harrison

Copy link
Copy Markdown
Contributor

Closes the first half of W1.

  • A workflow step can carry review: { lenses }: lenses in parallel, three voters, two needed, capped rounds, writes specs/<n>/review.json.
  • The human gate classifies the diff and needs the approvals its risk tier asks for.
  • prepush and eval checks now point at files that exist, with a test that asserts it.
  • feature-sdd gains constitution, clarify, tasks and analyze stages.

Known gap: in a real run cli.ts passes only the current gh login, so a high-tier gate (two approvers) cannot be met yet. Deploy, bands and retro are still not wired.

Failing tests first, in factory/engine/wiring.test.ts. make check exits 0.

🤖 Generated with Claude Code

Param-Harrison and others added 3 commits October 30, 2026 23:44
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
…e in ui-visual

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
@Param-Harrison
Param-Harrison merged commit db9032e into main Oct 30, 2026
11 checks passed
@Param-Harrison
Param-Harrison deleted the feat/wire-engine branch October 30, 2026 21:52
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant